Jobseekers
View Jobs
Post Resume
Executive Marketing
Career Transition
Resume Distribution
Career Counseling
Career Newsletter
Resume Writing
Employer Research
Relocation Guide
Career Articles
BuildTalk
 ConstructionCEO
 Executive Coaching
 Employer Directory
Employers
View Resumes
Post Jobs
Post Newswires
Recruiter Locate
Retention Planning
Outplacement
HR Service
Reference Checking
E-Background Check
Assessment Testing
Salary Calculator
ExecJob News
Hiring Articles
 Construction Report
 Succession Planning
 
 
 
  

EXECUTIVE CONSTRUCTION PROFILES

 
  Senior Director
 
Name:
tlamarwms
Industry Type: Energy Producers - Developers
City & State: Statesboro,GA
Job Title: Senior Director
Relocation Preferences: Any
Objective: Director or higher
Resume:
RESUME

Terry L. Williams
SUMMARY


30 years experience in the power industry with main focus on new construction, retrofit/upgrade projects, Service and maintenance.
Adept in Turnkey projects from front end engineering to final buy out and closing.
Qualifications include:
RFP Process/ Due Diligence
Project Cost Estimating and Projection
Document Control
Project Safety
Material Procurement and Budgeting
Heavy Rigging and Equipment Moving
Customer/Client Interface
Engineering Design
Sub-Contractor Selection and Contract Negotiation
Quality Assurance
Project Staffing
Union Labor Relations
Community Relations (i.e.: Civic Groups, Local Government, etc.)
Project Scheduling
Sales and Marketing
Service and Maintenance

EDUCATION
BSEE, University of South Carolina

PROFESSIONAL EXPERIENCE
Sept. 09 - Present
Aker Industrial Constructors Inc. - Senior Director, Power and Environmental Projects
Responsible for day to day operations of Power and Environmental Project Construction Division business along with business development.

Oct 06 Sept. 09
PROGRESS ENERGY PROJECT CONSTRUCTION MANAGER
Crystal River Clean Air Project Crystal River Energy Facility Crystal River, Fl.
2 FGD Scrubbers and associated equipment
1 Dual Flue 550 Chimney
1 Coal Pile Liner installation
1 New Plant access road
2 SCR installations
2 Electrostatic precipitator rebuilds
1 Limestone and Gypsum storage and conveyor system
1 Upgraded railroad system
1 Urea Ammonia System


April 05 Oct. 06
GENERAL MANAGER OF OPERATIONS Performance Construction, Marietta, Ga. General Manager over daily functions of the National Construction and Sales Division of United Development. Focus on new construction of Alternative Fuel Plants and Industrial Logistics with maintenance and repair of Plant equipment.

Jan 04- April 05
CFB PROJECT MANAGER - Kvaerner Power, Charlotte, NC.
Prime Contractor over Installation of a 475Klb p/hr CFB Boiler, Manitowoc, Wisconsin

Jan 03- Jan 04
SENIOR PROJECTS MANAGER - Exelon Corp., Ft. Worth, Texas
Prime Contractor over the Installation of 2 SCR units on existing 458 MW generation units.
Scrs were Aqueous Ammonia type. Full Project Management responsibility

March 02- Jan 03
SENIOR PROJECTS MANAGER - PPL, Long Island, New York
Construction Of Two New Plants (concurrent construction)
Shoreham Energy facility (Simple Cycle) (Approx. 250 Personnel)
2 GE LM6000 Machines (Fuel Oil Fired)
2 Deltak SCR Units w/Ammonia Injection
Edgewood Energy Facility (Simple Cycle) (Approx. 250 Personnel)
2 GE LM6000 Machines (Gas Fired)
2 Deltak SCR Units w/Ammonia Injection

Aug 00- March 02
PROJECTS MANAGER---Ameren UE, St. Louis, MO.
Construction of four (4) new plants (concurrent construction)
Grand Tower Re-power Project (Combined Cycle) (approx. 800 Personnel)
v2 Siemens Westinghouse W501F machines
v2 Nooter HRSG Boilers w/ Gas Boost
v2 Westinghouse Steam Turbines
Kinmundy Power Plant (Simple Cycle) (Manpower to 200 Personnel)
v2 Siemens Westinghouse D5A machines
Columbia Energy Facility (Simple Cycle) (Manpower to 150 Personnel)
v4 GE LM 6000 B Machines
Pinckneyville Power Plant Phase 2 (Simple Cycle) (Manpower to 150
Personnel)
v4 GE LM 6000 LM B Machines

Scheduling, Logistical and Technical support for Site managers, Project Auditing, Installation Contractor Interface, Change Order Negotiations and Cost Projections, Staff Meetings, Safety, TQM.

Mar 00-Aug 00 PROJECT CONSTRUCTION MANAGER--Santee Cooper, Iva, S.C.
Managed the Construction of an 800MW Combined Cycle Gas Turbine Power Generation Facility. Inclusive of the following equipment:

2 150MW GE Frame 7FA units (Combined Cycle)
2 NEM HRSGs
2 150MW GE Frame 7FA units (Simple Cycle)
1 B.O.P. inclusive of 11 Subcontractors with a manpower loading of 700 personnel

Jan 99- Mar 00CONSTRUCTION MANAGER---Putnam Engineering, Tampa, Florida
Prime Contractor - Managed the Construction of overall project for Putnam Engineering for 2 Siemens 84.2 Simple Cycle combustion Turbine units and B.O.P. Managed personnel hiring, training, project coordination, material procurement, subcontractors, Start Up and turnover.

Mar 92- Nov 98 SERVICE REPRESENTATIVE -- Cegelec Automation/Alstom USA,
Service Contractor for VFD, DC, and High Voltage breakers for Cegelec Automation. - Manage the
Construction of Multiple projects ( Macon Water Authority, Marathon Key Switchyard, Exxon Baytown
Project) along with Service and Repair (QE-II, J-Ray McDermott, Shell, 3M, Georgia Prison System, Etc,).
Included were repair, factory wiring of drives, VFDs, DC Drives, General troubleshooting and repair of Low, Medium and High Voltage equipment.

Jan 83 Mar 92 OPERATIONS MANAGER - Smith Industrial Contractors, San Antonio,TX.
Managed the Day-to-Day operations of the Industrial Construction Division to include: Auditing for Projects, Finance, Board Reviews and Staff Requirements and day to day Division operations, Marketing and Sales, Maintenance and Service. Started as Field hand and was promoted through to this position.

 
 
Home  |  Contact  |  About  |  Advertise  |  Terms  |  Privacy  |  Rates  |  View Jobs  |  Post Jobs  |  Resources
Copyright 2010. All Rights Reserved.

Executive Construction Jobs | Construction Trades Jobs | Energy Jobs