Jobseekers
View Jobs
Post Resume
Executive Marketing
Career Transition
Resume Distribution
Career Counseling
Career Newsletter
Resume Writing
Employer Research
Relocation Guide
Career Articles
BuildTalk
 ConstructionCEO
 Executive Coaching
 Employer Directory
Employers
View Resumes
Post Jobs
Post Newswires
Recruiter Locate
Retention Planning
Outplacement
HR Service
Reference Checking
E-Background Check
Assessment Testing
Salary Calculator
ExecJob News
Hiring Articles
 Construction Report
 Succession Planning
 
 
 
  

EXECUTIVE CONSTRUCTION PROFILES

 
  Construction Executive
 
Name:
Brian Egler
Industry Type: General Contractors - Managers
City & State: Westfield,IN
Job Title: Construction Executive
Relocation Preferences:
Objective: Desire to utilize my experience in the Construction Management business by leading and directing groups to result in successful projects and business units.
Resume:
Served with responsibility and leadership in senior management  for the successful completion of the following projects totaling over $790 Million consisting of the following functions: 

 

  • Managed overall project management and engineering.

  • Developed project staffing and performance reviews.

  • Promoted high standards of quality and safety.

  • Championed client and design consultant relations.

  • Monitored project scheduling, profit reporting and cost control .



 



Senior Project Manager-Thompson Thrift Construction     2014-Present



Leading and directing project management and engineering functions for the following projects:

 

Tanglewood Pavilions Development-Elizabeth City, North Carolina

$15 Million-104,000 SF-New retail development consisting of (2) anchors  and (17) tenant improvements inclusive of 14 acres of site work development.

 

Concord at Christenbury Development-Concord, North Carolina

$12 Million-80,000 SF-New retail development consisting of (2) anchors  and (14) tenant improvements inclusive of 10 acres of site work development.

 

Gander Mountain-Champaign, Illinois

$5 Million-25,000 SF-New retail development consisting of full store fit out independent of store fixtures inclusive of  3 acres of site work development.

 

 

Senior Project Manager-Mortenson Construction                    2011-2014

 

Leading and directing project management and engineering functions for the following projects:

 

Spinning Spur Two Wind Energy Project- Adrian, Texas

$38 Million –(87) GE Wind Turbines including 20 square miles of site development, foundations, underground electric collection system, O & M Building and site restoration.

 

BACH Army Community Hospital- Ft Campbell, Kentucky

 

$ 2 Million- (2) Levels -15,000 SF-Renovation of existing general and administrative space for the Army Corp of Engineers.

 

Shiloh IV Wind Energy Project-Rio Vista, California

$37 Million- (50) REpower Wind Turbines including 16 square miles of site development, foundations, underground electric collection system, substation,

O & M Building and site restoration.

 

Rolling Hills Wind Energy Project-Massena, Iowa

$105 Million- (193) Siemens Wind Turbines including 62 square miles of site development, foundations, underground electric collection system and site restoration.

 

 

Senior Project Manager - Pepper Construction of Indiana       2006-2011

 

Riley Hospital for Children- Simon Family Towers-Indianapolis, Indiana

 $170 Million- (2) new (11) story towers-750,000 SF consisting of Medical Surgery, Pharmacy, Radiology/MRI, Emergency Department, Ambulance Bay and  Life Safety Heliport  Services.

 

 Riley Hospital for Children- Simon Family Towers-Indianapolis, Indiana

$20 Million- (4) Level Parking Garage with entrance loggias into the new hospital.

 

Riley Hospital for Children- Simon Family Towers-Indianapolis, Indiana

$10 Million –(3) Level Facilities Central Energy Building feeding the new hospital.

                                   

 

Senior Project Manager,  The Clark Construction Group   1997-2006

 

Orange County Public Schools-Boone High School-Orlando, Florida

$ 34 Million- (6) new (2) story classroom buildings, media & physical education centers with ongoing extensive renovations to existing buildings on an active student campus.

 

 Orange County Convention Center Phase V-Orlando, Florida

 

$490 Million Joint Venture-1.6 million total SF-consisting of 1 million SF of Exhibition Hall with (2) 4 level concourses, connecting walkways and bridges on 300 acres of site development. Primarily responsible for $160 Million directly attributable to the superstructure of the facility.

      

GEICO Regional Customer Telephone Service Centers-Lakeland, Florida and Macon, Georgia

 

$44 Million –600,000 SF-(2) 4 story office buildings with penthouse inclusive of Kitchen/Dining facility, Computer Data and access floor production areas all surrounded by over  35 acres of site development.

 

 Responsible for Preconstruction services for the following project:



 Copperfield’s Magic Undergound-MGM Studios-Orlando, Florida

 $22.85 Million-5 -level dinner theater inclusive of theming, illusions, tunnel    and Sitework.

                                          

Project Manager, Walbridge Aldinger Inc.                              1995-1997

 

Achieved successful completion of the following projects totaling over $70 Million with primary responsibility for project management and control from buyout to closeout.

 

Muvico Theater Renovations-Hialeah and Boca Raton, Florida

$1.50 Million-70, 000SF renovations of existing facilities during ongoing theater operations.

 

Gulf Coast Factory Outlets-PH 111-Ellenton, Florida

 $ 3.50 Million –30,000SF expansion inclusive of sitework, shell, interior fitouts, Saks Off 5th Avenue and Liz Claiborne



 North Georgia Premium Outlet Shopping Mall- Dawsonville, Georgia

 $22.3 Million – 322,000SF of retail outlet space and food court inclusive of site work, shell construction and tenant build-out for over 80 lease spaces in (4) buildings on 77 acres of land.

 

Target Stores-Dayton Hudson-East, Mid and SouthWestern United States

$42.6 Million – 760,000SF of retail over 8 stores inclusive of sitework, shell and   buildout.

     

Regional Construction Representative, Kmart Corporation 1991-1995

     

Directed overall store construction in a two state region in conjunction with responsibilities  for capital  budgeting, cost control, project quality, and scheduling for the following projects:

 

Kmart New Stores/Expansions & Super Kmart Centers-Carolina

$61 Million - 2.53 million SF- 29 projects.

 

 

Project/Cost Engineer, McDevitt & Street Company                  1988-1991

 

Accomplished duties for the following projects totaling over $86 Million inclusive of the following: shop drawings, submittals, scheduling, change order management, design coordination ,sub-contract management and job cost maintenance.

 

Charlotte Knight’s Stadium- Fort Mill South Carolina

$14.50 Million- 30,000 seat stadium with service tunnels, 3 concourses & 11 skyboxes.

     

Richland Fashion Mall-Columbia, South Carolina

$71 Million- 1 million SF- 3 level retail mall with parking garage and 8 plex

 theater on roof parking level.

                                   

 

Estimator/Project Engineer, B.G. Danis Corporation                1986-1988



 Provided bidding and estimating functions for Environmental Water Treatment and Waste Water Treatment projects as well as project engineering for the following project:

 

Emery Hub Terminal Airport, Dayton Ohio

 $15 Million- 40,000 SF fast  track expansion project.

 

 

 

EDUCATION

 

 

B. S. - Construction Management/Minor in Business Administration-Indiana State University-Terre Haute, Indiana.

 

 

COMPUTER SKILLS

 

                             

                              Prolog Manager

                              Constructware

                              MS Office Suite-Excel, MS Word, Access, Project & Power Point

                              Primavera & Sure Trak Project Manager

                              Microsoft Project

                              Timberline Project Management System

                              AS-400 Job Cost System

                              Plans & Specs Project Management System

                              JCS 2000

                              JD Edwards Job Cost System

 

 

TRAINING  CERTIFICATIONS & SEMINARS

 

                              OSHA 10 Hour

                              Scaffolding Certification

                              Trenching/Excavation Competency

                              Blood borne Pathogens Safety Training

                              Cranes & Rigging ACIG Safety Training

                              Total Quality Management  Program

                              Fall Protection Training

                              Leadership & Development Seminars

                              Teambuilding Conferences

                              Resolving & Managing Conflict Seminars

 

 

COMMUNITY ACTIVITIES

 

 

                              Boy Scouts of America-Crossroads Council

                              Rebuilding Together Program

                              Habitat for Humanity

                              Wheeler Homeless Missions Outreach

 

 

REFERENCES        Available Upon Request

                             

 


 
 
Home  |  Contact  |  About  |  Advertise  |  Terms  |  Privacy  |  Rates  |  View Jobs  |  Post Jobs  |  Resources
Copyright 2010. All Rights Reserved.

Executive Construction Jobs | Construction Trades Jobs | Energy Jobs