Nuclear I&C / Electrical designs, Digital Upgrades, software verification & validation, Distributed Control System (DCS), software and hardware requirement specifications, software design descriptions, software life cycle plans, factory & site acceptance tests, and plant modification processes and Plant Licensing and Regulations
Resume:
CHANDRAKANT PATEL
521 Siltstone Place
Cary, NC 27519
(919) 760-3954
patelchan123[at]gmail.com
Qualifications Summary:
Instrumentation and Control / Electrical Engineering experience in application, design development, implementation and testing of Nuclear Power Plant and coal-fired power plants control, protection and monitoring systems.
Experienced in I&C / Electrical designs, Digital Upgrades, software verification & validation, Distributed Control System (DCS), software and hardware requirement specifications, software design descriptions, software life cycle plans, factory & site acceptance tests, and plant modification processes for various safety and non-safety systems of nuclear power plant.
Hands-on experience working with Tricon Triple Modular Redundant programmable logic controller, Westinghouse Ovation and Foxboro I/A Series distributed control system.
Experienced in NRC 10CFR50 and 10CFR52 plant licensing processes, Design Certification Document, Safety Evaluation Report, Licensing Topical Reports, COLA, regulatory guides, branch technical positions, and industry standards including IEEE, EPRI, IEC etc. applicable to I&C and electrical systems of nuclear plant.
GE NUMAC, Ventyx Nuclear Asset Suite(Passport), ETAP, DOORS, NRC 10CFR50 & 10CFR52 codes and
regulations, NUREG-0800, Regulatory Guides, BTP, IEEE, IEC, and EPRI Standards, AutoCAD, Microsoft
Word, Excel, Access, Visio, PowerPoint, Project.
Project Accomplishments:
Fuqing & Hainan (CPR) Independent verification and validation including factory acceptance testing of Reactor Protection System and Engineered Safety Feature Actuation System for Tricon safety-related application
Brunwick 1&2 (BWR) Upgrade ofRecirculation Flow Control system with Siemens WCIII Variable Frequency Drive System
McGuire 1(PWR) Site Acceptance Test for Westinghouse Ovation DCS for non-safety I&C Systems
GE ESBWR I&C design development for Reactor Protection System and Engineered Safety Features System
Turkey Point 3, 4 (PWR) Tricon Digital I&C upgrade for Qualified Safety Parameter Display System
St. Lucie 1, 2 (PWR) Tricon Digital I&C upgrade for Qualified Safety Parameter Display System
Kewaunee 1 (PWR) Tricon Digital I&C upgrade for Qualified Safety Parameter Display System
Cooper Station (BWR) Tricon Digital I&C upgrade for Reactor Vessel Level Control System
Shearon Harris (PWR) Safe Shutdown Analysis
H. B. Robinson 2 (PWR) 10CFR50 Appendix R compliance and Fire Protection Program
Dresden 2, 3 (BWR) SBO Diesel Generator and Generator-Transformer Relay Protection System
Quad Cities 1, 2 (BWR) SBO Diesel Generator and Generator-Transformer Relay Protection System
Calvert Cliff 1, 2 (PWR) Process drawing change request, field change request and engineering change notices
Browns Ferry 1, 2, 3 (BWR) Heat Load Calculations for power plant equipments
Training:
Successfully completed ESBWR Software Management and Software Quality Assurance Plan training.
Successfully completed GE Hitachi ESBWR, GE ABWR and BWR system fundamentals training course.
Successfully completed TriStation 1131 software development training for Tricon PLC programming and Tricon Triple Redundant Architecture and internals training.
Successfully completed one-year on-job training course in Operation and Maintenance of Coal Power Plant.
Education:B.S. Graduate Major in Electrical / Electronic Engineering, Gujarat University, India.
Providing subject matter expertise on Reactor Protection System (RPS) and Engineered Safety Feature Actuation System (ESFAS) for Invensys China Nuclear Independent Verification and Validation project in accordance with IEEE-1012.
Responsible for developing software plans, factory acceptance test plan, test case specifications and test procedures for functional test, response time test, hardware test and communication test for RPS and ESFAS of Fuqing & Hainan China new nuclear plants for Tricon DCS application.
Involved in design reviews of Software Requirement Specifications, Software Design Descriptions, application program, component test, integration test and technical documents.
May 2010- Sep 2010 Sr. I&C Design Engineer, Progress Energy, Southport, North Carolina:
Prepared and reviewed design modification procedures and specifications for digital upgrade of replacing existing Motor-Generator sets for Reactor Recirculation Flow Control system with Siemens WCIII Variable Frequency Drive System at Brunswick nuclear plant.
Feb 2009- Mar 2010 Lead Modification Engineer, Duke Energy, Huntersville North Carolina:
Performed system acceptance test and prepared test procedures for replacement of non-safety related control and instrumentation systems including feed water control, reactor control, pressurizer level & pressure control with a Westinghouse Ovation distributed control system on digital upgrade project at McGuire nuclear plant.
Reviewedengineering design modifications, functional requirement documents, control logic diagrams of Ovation DCS for the non-safety nuclear systems.
Feb 2006- Jan 2009 Sr. Nuclear I&C System Engineer, GE-Hitachi, Wilmington, North Carolina:
Responsible lead system engineer for detailed I&C design development implementation of Reactor Protection System, Engineered Safety Feature Actuation Systems including Leak Detection & Isolation System and Isolation Condenser System for GE ESBWR nuclear power plant project.
Developed detail design documents including system design specifications, logic diagrams, I/O database, hardware and software requirement specifications for RPS and ESFAS. Prepared I&C sections of ESBWR design control document for NRC licensing certification.
Provided licensing supportduring DCD certification, COLA process and I&C detail designs by preparing responses to NRCs request for additional information, and to compliance with 10CFR50, Regulatory Guidelines, IEEE standards, Branch Technical Positions, and various nuclear regulatory codes and standards.
Verified design documents for nuclear I&C safety and non-safety systems including Neutron Monitoring System, Nuclear Steam Supply System (NSSS), Emergency Core Cooling System, Steam Bypass & Pressure Control System, Feed Water Control System, and Turbine Control System.
Participated in preparing DCS architectures and its communication interfaces. Verified Licensing Topical Reports for NUMAC, TRICON, Setpoint Methodology and DCS application.
Developed software application for integration and implementation of Tricon triple modular redundant logic controller for digital upgrade project of Quality Safety Parameter Display System for Turkey Point, St. Lucie and Kewaunee nuclear power plants.
Prepared design documents, software and hardware requirement specifications, software design descriptions, I/O database, failure mode & effect analysis, functional diagrams and communication interface for Tricon PLC, Foxboro I/A series DCS and Westinghouse Common Q display.
Developed and configured TriStation 1131 software application program using Structured Text and Function Block Diagram languages.
Involved in validation and verification of software code and performance of Factory Acceptance Test.
Jan 1999-Apr 2004 Production Manager, FINE Engineering, San Diego, California:
Managed operation of production, sales, purchasing, quality control, scheduling, and document control required for manufacturing of Printed Circuits Boards and Cable / Wire Harness Assembly.
Jan 1991-Mar 1998 Design Engineer, BECHTEL Power Corporation, Gaithersburg, Maryland:
Prepared project plan and engineering change notice for generator-transformer relay protection system and Station Blackout emergency diesel generator modifications for Dresden and Quad Cities Nuclear Power Plants.
Involved in reviewing technical specifications of DCS system for Westinghouse, ABB and Foxboro I/A system.
Prepared, reviewed and processed engineering change notices and modification packages in support of UFSAR and design basis update for Calvert Cliffs Nuclear Power Plant.
Calculated heat losses from electrical equipments in various plant areas for TVA Browns Ferry Nuclear Plant.
Mar 1989-Jan 1991 Application Engineer, NUS Corporation, Gaithersburg, Maryland:
Developed a safe shutdown analysis to compliance with fire-protection program 10CFR50 Appendix R and 10CFR50.48 for Robinson Nuclear Power Plant.
Reviewed process control diagram, P&ID, logic and control schematics, electrical single line and wiring diagrams for various nuclear systems to compliance with fire-protection program.
Performed fire hazard analysis, spurious actuation of coordinated circuits, short circuit and voltage drop calculations and circuit failure analysis for Shearon Harris Nuclear Power Plant.
Jun 1985-Oct 1988 Power Plant Engineer, Gujarat Electricity Board, India:
Responsible for operation and maintenance of electrical power and control system of Boiler control supervisory system, ash handling system, main steam, fuel system and turbine-generator auxiliaries system for 210MW Coal-Fired Power Plant.
Prepared single line, schematics, loop, logic and wiring diagrams for electrical /control power systems.
Involved in startup, shutdown, troubleshooting and synchronization activity of Coal-Fired Power Plant.