Rajendra L Desai Objective: To best utilize my varied experiences in Civil Engineering Project, in the areas of design, field - inspection and project planning. Education: XB.S.in Civil Engineering from S.V.R College of Engineering &Tech. Surat, South Gujarat University Surat, India. XMicro station (Geopak) XAuto CAD R14 & Auto CAD 2000i. (AutoCAD Land Development Desk top 2000). XCertified P.C.C. Level I& Level II, (IDOT &ACC I). XCertified Mixture Aggregate Technician course. XCertified Nuclear Density Course.( Troxler)
Experience: Project Engineer: Homer L Chastain and Associates Inc.Chicago IL.From Jan.2008 to present. XInspection of I-88 Mp.309.9 to 308.1 construction and management. XInspection of bridge( EAST WEST connector) on I -88. XInspection of Demolition of Bridge EWC.ON I-88. XInspection of bridge on spring Creek. . Design& Drafting& field inspection of highway, storm sewer, drainage structure, detention area calculation etc. XDesign and drafting& field inspection of culvert, retaining wall, bridges. XDesign and drafting& field inspection of water main, water treatment plant, pump house etc. XKnowledge of HEC-I, HEC-II, HEC-RAS, POND PACK PROGRAM. XDesign and drafting of Improvement of intersection at IL-59 & Batavia Road. New Traffic Signal. Design and Inspection of traffic Signal. Fixing of double hand hole, heavy duty hand hole, control point, arm post .Resurfacing of pavement. XDesign and drafting & Inspection of Slotted Pavement Drain, cross over, pullout, widening of shoulder on both sides and median. XInspection of Erosion Control on I- 88 mile post 309.8 to 308.7 XDesign and drafting &Inspection of Noise wall # 1 on I -88 East Bound.
.Experience: Project Engineer: Louis Jones Enterprises Inc. Chicago. From Jun 2007 to Nov.2007. X Inspection of Slotted Pavement Drain, cross over, pullout, widening of shoulder on both sides and median. XInspection of Erosion Control on I- 90 mile post 61.1 to 74.5. XInspection of Light pole on both sides of road. XConstruction management for the work of Tollway-90. XTaken the training of I-MIR at TOLLWAY. XInspection of Slotted Pavement Drain, cross over, pullout, widening of shoulder on both sides and median. XInspection of Erosion Control on I- 90 mile post 61.1 to 74.5. XInspection of Light pole on both sides of road Construction Inspection of I -90 from mile 61.1 to 74.5, resurfacing of side shoulder and median shoulder Project Engineer: EJM Engineering Inc. Chicago, From Dec.2006 to June 2007 XConstruction Inspection of sidewalk, Curb & Gutter, ramp, bus pad, Allies on street for the city of Chicago. XConstruction Inspection of Arterial resurfacing Program for the street of Chicago. XField inspection of ADA ramp on side walk for CDOT work. Design and drafting by using Microstation V8. XDesign and drafting of UPS Office Parking Lot extension project. Design and calculation of detention area calculation etc. Submittal for MWRDG permits. XDesign and drafting of runway 31c and 22 L of Midway Air Port Chicago. By Engineering Material Arrestor System. XDesign and drafting of ramp on side walk on Chicago DOT Assistant Resident Engineer: M.B.B Construction Group, Inc. Markham, IL. From Nov. 2005 to Nov.2006 XInspection of Toll way I- 355-South Extension up to IL - 80 .Checking of design and hydraulic calculation of Highway and drainage work. XInspection of Bridge on 151st street,159th street,163RDstreet,167TH Street, Gougar Road Bridge and 175th street across the Toll way I -355. XField inspection of Spring Creek Bridge on I-355 Toll way. Inspection of Pier and North and South Tollway. XInspection of Street Pier and East and West abutment of all bridges. XInspection of storm water sewer of I-355 mainline. XInspection of H-pile and steel shell pile. XInspection of Pedestrian culvert cum drainage &Casing for future water main and sanitary sewer XInspection of Erosion control Work. XPrepare I.D.R and Daily Activity Report. Project Engineer: Seibert Engineering Inc. Lisle, IL. From Jun 2005 to Oct. 2005. Design and Drafting by using AutoCAD Land Development Desktop. XPlanning and design& review of Caledonia Sub Division Project, (for Centex Homes) Caledonia Village about 200 acre plot -2 neighbor hood. Design and review of storm sewer, sanitary sewer, water main, street planning, light, fire hydrant etc. XPlanning and design of Water Treatment Plant of 1 mgd capacity for the village of Caledonia. XPlanning and design of Waste Water Treatment plant of .5 mgd for Caledonia village. XPlanning of road improvement of Caledonia road of Caledonia Village. XReview of flood plain study of Willow creek for the Caledonia Village. XHydraulic program like HEC-I, HEC-II, HEC-RAS, POND PACK, WATERCAD, STORMCAD, TR-20, TR-55 etc. XDesign of detention area calculation, floodplain study, wetland treatment. XReview of other utility like electric line, gas line, telephone line, irrigation force main line. XReview of Landscape planning. XPlanning ,design and drafting of Capital Grill Project, Lombard. Design of storm sewer, sanitary sewer, watermain, parking lot, grading plan etc.
Project Engineer: Lintech Engineering LLC. : Crystal Lake IL-60014 From August 2004 to June 2005. Design and drafting by AutoCAD Land Development Desktop. XPlanning and design review of Cambridge Lakes-Pingree Grove Village about 1000acre plot -20 neighbor hood. Design and review of storm sewer, sanitary sewer, water main, street planning, light, fire hydrant etc. XPlanning and design of Water Treatment Plant of 2 mgd capacity for the village of Pingree grove. XPlanning and design of Waste Water Treatment plant of 1 mgd for Pingree grove village. XPlanning of road improvement of reinking road of Pingree Grove. XReview of flood plain study of Tyler creek for the Cambridge Lakes, Pingree Grove Village. XHydraulic program like HEC-I, HEC-II, HEC-RAS, POND PACK, WATERCAD, STORMCAD, TR-20, TR-55 etc. XDesign of detention area calculation, floodplain study, wetland treatment. XReview of other utility like electric line, gas line, telephone line, irrigation force main line. XReview of Land scape planning. XReview of Improvement Of IL 72 road .Design and cross section of new Improvement
XCivil Design Engineer: Landtech Consultant LTD; Homer glen, IL 60441 From Jun 2003 to July 2004. XDesign of storm sewer, sanitary sewer, water main , detention area calculation, earthwork calculation ,grading plan, street planning ,light fire hydrant, crossing schedule, road, curb& gutter, side walk, floodplain study for Old Mill &Sunset Lake Project.(for Landtech Consultant and Hemilton Partner) XUse of HEC-I, HEC-II, HEC-RAS, POND PACK, TR-20, TR-55 program. XResponsible for Coordination of all site development activities and preparation and management of Land Development Budgets. XEstablishing initial budget and schedule; continuously monitoring and improving both. XEstablishing Bonds &Letter of Credit. XObtaining municipal approval of preliminary and final Plat of Sub division and other permits. XSupporting Land Acquisition team in their pursuit of properties. XTurning over improvements to the municipalities and zeroing out Bonds and Letter of credits.
XCivil Design Engineer: Soodan & Associates, Inc.Architect, Engineers & Construction Consultants, and Chicago 60602. From July, 2001 to Jun, 2003. XPlanning, Design and Inspection of Highway and Bridges. (ISHTA and IDOT) XPrepare 10 years planning & Designing for East VWest Toll way, North Vsouth Toll way, Tri VState Toll way of Illinois. XPrepare plans and profile for Highway by using Micro station. XConduct impact studies, intersection/signal design, accident analysis, and geometrical design for Illinois Toll way. XPlanning and Design and Inspection of Noise wall of Toll way of Illinois. XCoordinate design and construction project with emphasize in structural design. XReview structural plans and inspect field condition. XPlanning, Design & Inspection of work for IDOT, CTA, METRA, and CDOT & AIRPORT. XPlanning, Design of Highway by using Micro station SE. XDesign and planning of Skyway project. XPrepare estimate, write specification, and prepare schedule for various Civil Engineering Project. Land Development Engineer: Henderson and Bodwell Consulting Engineer, LLP. Elmhurst, IL from April 2000 to July2001. XPreparing plans, design and field inspection and estimates of site land development project (Glen of Inverness, Central Park-Bolingbrook, Walkup at the park unit-2 Crystal Lake, Waterford unit, Aurora, University Place, Hoffman Estate, Canterbury Field, Canterbury Farm Hoffman estate, Falling Water-Lindhurst, Hoffman homes- Waukegan.) XDesign of storm sewer, sanitary sewer, water main, watershed drainage, detention area calculation, parking lot design, Grading Plan, Sub Division Plan, Fire Hydrant, Light, Earthwork Calculation, street design, Driveway slope Calculation, Crossing Schedule. XPlanning & design of sub division size 100 Acre Parcel. XFamiliar with hydrology and hydraulic software. (HEC-I, HEC- II, RAS Program. XDesign and inspection of Highway and Bridges. XInspection of water main, valves, hydrants and service line. XInspection of sewer main, manholes and service line. XInspection of storm sewer, manholes, catch basin, and detention /retention pond. XInspection of mass grading and earthwork. XInspection of curb and gutter construction, road base construction, compaction and asphalt construction. XDesign and Inspection of Oplaine road Ex.Buckly Road and Farnsworth road for Lake county &Cook county. XDesign of Storm water/Wastewater collection, Treatment plan. XDesign, Submittal, Permission from various agencies like EPA, MWDRD, IDOT, FEMA. XAuto Cad Land Development Desktop 2000. XC A D D (Micro station SE) Resident Engineer: Summit Construction Company Inc.Skokie, IL 60076 from Feb 1999 to Jan 2000. XConstruction of Road, curb and gutter, side walk, municipal work, highway, bridge, culvert. XInspection of Concrete High way, Asphalt road XReviewed and made recommendation for preliminary plan, subdivision plans, site plans, rezoning development plan, grading plan, public improvement plans, waiver condition plans, record plate, & easement plans. XReviewed, evaluated and made recommendations on the environmental impact of proposed development, the needs for drainage studies, flood plain studies, soil studies and CBR test result. Evaluated, coordinated and determined street design and alignment Requirements for zoning development plan, subdivision plans, site plans, and necessary requirements associated with wavier requests and other plans. Personnel: Visa-- U.S. Citizen